So Much Going On!

Diane McIntire's picture

It may not look like it from the outside, but there is so much going on in the new building! The KVMR interior walls are all drywalled and textured.  The painters started today with sealing the walls.  The second level gypcrete floor (gypsum concrete) was poured today.  Drywallers are finishing in the Nevada Theatre backstage area.  The exterior stucco lath is in place.  Preparations are underway for P G & E to set the electrical transformer and for the stair work on the west end of the building to begin.  The siding work is nearly complete, the antenna tower is under construction off-site. Volunteers are working out design details for the wainscoting, interior trim work, and studio consoles.  Wow!!